Case Studies

tercel-cs-03

$286,832 in savings

GunDRILL Reamer achieves significant cost savings by eliminating the need for a dedicated wiper run. Tercel designs, customizes and manufactures drilling and well construction products that reduce complexity, risk and help solve real-world challenges.

Read more...
24hours

24 hours from manufacture to rig floor

Using in-house design and local production facilities, the Tercel BridgeBUSTER® was customized to meet the client’s requirements within 24 hours, allowing operations to continue with no NPT resulting in a significant cost saving for the customer.

Read more...
cs-image-05

$3,000,000 saving through reduced NPT

By replacing a standard stabilizer at the top of the BHA with Tercel’s GunDRILL Reamer the client saved USD3m in non-productive time. Using Tercel’s proprietary PDC/TCI-based design the client reduced back-reaming time as opposed to a BHA with no back-reaming capability in challenging sand shale with sticking, cutting beds and circulation issues.

Read more...
Profile

$8,000,000 saving on dedicated wiper trips

By replacing a standard stabilizer with Tercel’s GunDRILL Reamer the client saved up to USD8m per year by eliminating the need for dedicated wiper trips throughout the Bakken Field.

Read more...
Swivelmaster

12,950m and counting

Working offshore Sakhalin with a global operator, SwivelMASTER® reached target depth and helped complete the world’s longest horizontal well at 12,950 meters. With over 260 runs and no failures, the SwivelMASTER® track record is unrivaled.

Read more...